Established the main projection setup for the shot and reprojected parts of the townsquare set alongside with BG touch ups. Guy Riessen & Alonso Sanchez Alvarez worked some paint touch ups on the MG/FG architecture afterwards.
The last 2 shots inside the cathedral were (beautifully) extended and finalized by Eunchong Shin in my team. I was responsible for the main setup.
Paint work on BG set extension done by Isabelle Morello. I was responsible for the Interior reprojection setup & helped putting together the projection setup for the exterior/BG
BG mountain & snow by Matthieu Arnauld. Some facade touch ups by Nikola Angelkoski. Shrimp by Vanessa Goodnough.
Nikola Angelkoski worked on the exterior set extension. Vanessa Goodnough, Isabelle Morello & him also helped out on the interior part.
Established background mountain & city final look & did the projection setup both for the BG and the MG buildings. Adele Osauskaite helped me out with the snow paint work on the midground rooftops.
During my time at Framestore, I was given an extensive role on the Wonka feature film. My role evolved from senior DMP/visual development artist to lead. This was a huge project and I had the pleasure to work with a big team of great matte painting artists who helped push those shots to final including :
-Eunchong Shin
-Isabelle Morello
-Nikola Angelkoski
-Matthieu Arnauld
-Alex Leclerc
-Anastasiya Mangat
-Adele Olsauskaite
-Alonso Sanchez Alvarez
-Patrick Martini
-Guy Riessen
-Vanessa Goodnough